The rain eventually arrived by 5pm yesterday. The annoying thing was that had we moved when planned we would already have been moored after Netherton tunnel before the rain set in. Still today was dry but a bit cold so we donned our winter woollies and set off to make our way to Netherton and a nice mooring at Windmill End Junction on the Dudley No 2 canal. On the way we made a bit of a detour. As we still planned to do every navigable waterway in the UK, we turned left from the Birmingham level main line onto the Icknield Port loop, then crossed the BLML again to enter the Soho Loop.
|
Icknield Port Loop |
|
B W working boats |
|
and their pans |
|
Just about to cross the Birmingham level main line |
|
The junction from the Soho loop back onto the B L M L |
No comments:
Post a Comment