
We arrived at the tunnel entrance at 7.45 am. Waiting to go through was another boat called Marbeck Phoenix. As the lights were on red we had to wait a further 15 minutes for them to change to green before we were allowed to proceed.

Dead on 8 am the lights changed and we donned our water proofs, switched on all the cabin lights as well as headlight and nav lights and entered the tunnel. Yes it was wet but very easy to navigate through and we made the whole length in 15 mins.
No comments:
Post a Comment